In this project a group of nine students used their knowledge from "Information Technology Managment and Strategic Planning" course to develope a information technology strategic plan for our department (Computer Engineering department) during three months. We followed these steps in this project:
- Select the managers and assign roles in the group.
- Define group roadmap.
- Select the framework.
- Gather information about the required diagrams and how to draw them in System Architect software.
- Craete a template for interviews.
- Perform th interviews.
- Analyse the interviews.
- Analyse current situation of the organization.
- Design desirable situation.
- Make a list of necessary information systems to achieve desirable situation.
- Create a website to accomodate project documentaiton.
- Present the project result.
The supervisor of the project was Mr. Abtahi, and the group managers were Masoud Moshref Javadi and Ali Dabirmoghaddam. Some of the project documentes have been uploaded on the ce websever.
Screenshots:


|